[1] Levner, E., Perlman, Y., Cheng, T.C.E., Levner, I., "A Network Approach To Modeling The Multi-Echelon Spare-Part Inventory System With Back Orders And Interval-Valued Demand", Int. J. Production Economics 132, 43–51, 2011.
[2] Díaz, A, Fu, M. C., "Models For Multi-Echelon Repairable Item Inventory Systems with Limited Repair Capacity", European Journal Of Operational Research 97, 480-492, 1997.
[3] Felderhof, J.P.K., Konstantis, G., "A Three Echelon Spare Parts Provisioning Model", European Journal Of Operational Research 24, 118-122, 1986.
[4] Graves, S. C., "A Multi-Echelon Inventory Model for A Repairable Item with One-For-One Replenishment", Management Science Vol. 31, No. 10, 1247-1256, 1985.
[5] Gupta, A., Albright S. C., "Steady-State Approximations For A Multi Echelon Multi-Indentured Repairable-Item Inventory System", European Journal Of Operational Research 62, 340-353, 1992.
[6] Alfredsson, P., "Optimization Of Multi-Echelon Repairable Item Inventory Systems With Simultaneous Location Of Repair Facilities", European Journal Of Operational Research 99, 584-595, 1997.
[7] Shtub, A., Simon, M., "Determination Of Reorder Points For Spare Parts In A Two-Echelon Inventory System: The Case Of Non Identical Maintenance Facilities", European Journal Of Operational Research 73, 458-464, 1994.
[8] Sleptchenko, A., Heijden, M.C., A. Harten, A., "Effects of Finite Repair Capacity In Multi-Echelon, Multi-Indenture Service Part Supply Systems", Int. J. Production Economics 79, 209–230, 2002.
[9] Kalchschmidt, M., Zotteri, G., Verganti, R., "Inventory Management In A Multi-Echelon Spare Parts Supply Chain", Int. J. Production Economics 81–82, 397–413, 2003.
[10] Sleptchenko. A., Van Der Heijden M.C., Van Harten, A., "Using Repair Priorities To Reduce Stock Investment In Spare Part Networks", European Journal Of Operational Research 163 (2005) 733–750, 2005.
[11] Lau, H. C., Song, H., See, C. T., Cheng, S. Y., "Evaluation Of Time-Varying Availability In Multi-Echelon Spare Parts Systems With Passivation", European Journal Of Operational Research 170, 91–105, 2006.
[12] Jiangsheng, S., Sujian, L., Fanggeng, Z., Lv Yanmei, L., "Research on The Multi-Echelon Inventory Model Of Weapon Equipment Repairable Valuable Spare Parts", Automation And Logistics, 2007 IEEE International Conference, 662 – 665, 2007.
[13] Rappold, J. A., Roo, B. D. V., "Designing Multi-Echelon Service Parts Networks with Finite Repair Capacity", European Journal Of Operational Research 199, 781–792, 2009.
[14] Kranenburg, A.A., Van Houtum, G.J., "A New Partial Pooling Structure For Spare Parts Networks", European Journal Of Operational Research 199, 908–921, 2009.
[15] Topan, E., Bayndir, Z. P., Tan, T., "An Exact Solution Procedure For Multi-Item Two-Echelon Spare Parts Inventory Control Problem With Batch Ordering In The Central Warehouse", Operations Research Letters 38, 454_461, 2010.
[16] Perlman, Y., Levner, I., "Modeling Multi-Echelon Multi-Supplier Repairable Inventory Systems with Backorders", J. Service Science & Management, 3, 440-448, 2010.
[17] Liu, J., "Algorithms for Minimum-Cost Flows", Computer Science Department, the University Of Western Ontario, 2003.
[18] Ravindra K. Ahuja, Thomas L. Magnanti, And James B. Orlin., Network Flows: Theory, Algorithms, and Applications, Prentice-Hall, Inc, 1993.
[19] Ford, L.R., Fulkerson, D.R., "Flows In Networks", Princeton University Press, Princeton, N.J, 1962.
[20] Wagner, H. M., Whitin, T. M., "Dynamic Version Of The Economic Lot Size Model", Management Science Vol. 50, No. 12 Supplement, 1770-1774, 2004.
[21] Al-Rifai, M. H., Rossetti, M. D., "An Efficient Heuristic Optimization Algorithm for A Two-Echelon (R, Q) Inventory System", Int. J. Production Economics 109, 195–213, 2007.
[22] Díaz, A., Fu, M. C., "Multi-Echelon Models For Repairable Items: A Review", Working Paper, University of Maryland, Maryland, 1995.
[23] Edmonds, J., Karp, R., "Theoretical Improvements In Algorithmic Efficiency For Network Flow Problems", Journal Of ACM, 248-264, 1972.
[24] Garg, A., Deshmukh, S.G., "Multi-Echelon Repair Inventory Systems: Select Issues in Modular Electronic Equipment", Defence Science Journal, Vol. 60, No. 5, 514-524, 2010.
[25] Sasikumar, P., Kannan, G., & Noorul Haq, A., "A Multi-Echelon Reverse Logistics Network Design for Product Recovery-A Case of Truck Tire Remanufacturing", International Journal of Advanced Manufacturing Technology 49, 1223–1234, 2010.