[1] Khan, M., et al., A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics, 132(1), 1-12, 2011.
[2] Arrow, K.J., S. Karlin, and H.E. Scarf, Studies in the mathematical theory of inventory and production. 1958.
[3] Rosenblatt, M.J. and H.L. Lee, Economic production cycles with imperfect production processes. IIE transactions, 18(1), 48-55, 1986.
[4] Urban, T.L., Analysis of production systems when run length influences product quality. International Journal of Production Research, 36(11), 3085-3094, 1998.
[5] Gerchak, Y., R.G. Vickson, and M. Parlar, Periodic review production models with variable yield and uncertain demand. IIE transactions, 20(2), 144-150, 1988.
[6] Yano, C.A. and H.L. Lee, Lot sizing with random yields: A review. Operations research, 43(2), 311-334, 1995.
[7] Grosfeld-Nir, A. and Y. Gerchak, Multiple lotsizing in production to order with random yields: Review of recent advances. Annals of Operations Research, 126(1-4), 43-69, 2004.
[8]Inderfurth, K., Analytical solution for a single period production inventory problem
[9] Chan, W.M., R.N. Ibrahim, and P.B. Lochert, A new EPQ model: integrating lower pricing, rework and reject situations. Production Planning & Control, 14(7), 588-595, 2003.
[10] Salameh, M. and M. Jaber, Economic production quantity model for items with imperfect quality. International journal of production economics, 64(1-3), 59-64, 2000.
[11] Pentico, D.W. and M.J. Drake, A survey of deterministic models for the EOQ and EPQ with partial backordering. European Journal of Operational Research, 214(2), 179-198, 2011.
[12] Barzoki, M.R., M. Jahanbazi, and M. Bijari, Effects of imperfect products on lot sizing with work in process inventory. Applied Mathematics and Computation, 217(21), 8328-8336, 2011.
[13] Tsou, J.-C., S.R. Hejazi, and M.R. Barzoki, Economic production quantity model for items with continuous quality characteristic, rework and reject. International Journal of Systems Science, 43(12), 2261-2267, 2012.
[14] Papachristos, S. and I. Konstantaras, Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100(1), 148-154, 2006.
[15] Bakker, M., J. Riezebos, and R.H. Teunter, Review of inventory systems with deterioration since 2001. European Journal of Operational Research, 221(2), 275-284, 2012.
[16]اکبری فرزانه، صفاری محمد، سیاست بهینه سفارش دهی برای کالاهای فاسد شدنی با در نظر گرفتن سیاست پرداخت معوقه و تورم، مدیریت زنجیره تأمین, 16(45) ، 42-49، 1393.
[17] Glock, C.H., E.H. Grosse, and J.M. Ries, The lot sizing problem: A tertiary study. International Journal of Production Economics, 155, 39-51, 2014.
[18] Taleizadeh, A.A., M.P. Sari-Khanbaglo, and L.E. Cárdenas-Barrón, Outsourcing rework of imperfect items in the economic production quantity (EPQ) inventory model with backordered demand. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2017.
[19] Tsao, Y.-C., et al., Imperfect economic production quantity models under predictive maintenance and reworking. International Journal of Systems Science: Operations & Logistics, 1-14, 2019.
[20] Lin, H.-J., An economic production quantity model with backlogging and imperfect rework process for uncertain demand. International Journal of Production Research, 1-16, 2019.
[21] Al-Salamah, M., Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates. Operations Research Perspectives, 6 100-103, 2019.
[22] Khalilpourazari, S., et al., A robust fuzzy approach for constrained multi-product economic production quantity with imperfect itemsand rework process. Optimization, 69(1), 63-90, 2020.
[23] Newman, W.L., Social research methods: Qualitative and quantitative approaches. Allyn and Bacon, 1991.
[24]Saunders, M., P. Lewis, and A. Thornhill, Research methods for business students. Pearson education, 2009.