[1] A. Mohammadi, P. Shojaei, H. Yazdani, and M. Sadeghi Moghadam, “Supply chain risk management of gas transmission pipeline projects: A data-driven theoretical approach”. Quarterly Journal of Industrial Management Studies, vol. 14 (42), pp. 169-197, 2016. (In Persian)
https://doi.org/10.22054/jims.2016.5719
[2]. A. Mohammadi, A.N. Mosleh Shirazi, M.B. Ahmadi and P. Shojaei, “Structural Interpretive Modeling of Project Supply Chain Risks in Provincial Gas Companies”, Industrial Management Perspective, 3 (4), pp. 9-37, 2013, (In Persian)
https://jimp.sbu.ac.ir/article_87297.html?lang=fa
[3]. S. Al-Haidous & T. Al-Ansari, “Sustainable liquefied natural gas supply chain management: a review of quantitative models”, Sustainability, 12(1), pp. 243-260, 2019.
https://doi.org/10.3390/su12010243
[4].M.V.P. Muniz, G.B.A. Lima, R.G.G., Caiado, and O.L.G. Quelhas, “Bow tie to improve risk management of natural gas pipelines”, Process safety progress, 37(2), pp. 169-175, 2018.
https://doi.org/10.1002/prs.11901
[5]. G. Dehdasht, M.Z. Rosli, M.F. Salim, M.M. Abdullahi, A. Keyvanfar and R. McCaffer, “DEMATEL-ANP risk assessment in oil and gas construction projects”, Sustainability, 9(8), pp. 1420-1444, 2017.
https://doi.org/10.3390/su9081420
[6]. A. Atash Soz, K. Feizi, A. Kazazi and L. Olfat, “Interpretive-structural modeling of supply chain risks in the petrochemical industry”, Quarterly Journal of Industrial Management Studies, 14 (41), pp. 39-63, 2015, (In Persian)
https://doi.org/10.22054/jims.2016.4168
[7]. U. Jüttner, H. Peck, and M. Christopher, “Supply chain risk management: outlining and agenda for future research”, International Journal of Logistic Research and application, Vol.6, No. 4. , pp. 197-210, 2003.
https://doi.org/10.1080/13675560310001627016
[8]. M. Abdel-Basset, M. Gunasekaran, and N. Chilamkurti, “A framework for risk assessment, management and evaluation: Economic tool for quantifying risks in supply chain”, Future Generation Computer Systems, Vol. 90, pp. 489–502, 2019.
https://doi.org/10.1016/j.future.2018.08.035
[9]. A. Ghiyathvand, M. Khoshnoud, M. Oshk Sarai, and H. K. Amuzadeh, “Social analysis of investment risks in Iranian oil and gas projects using efficient decision-making”, Iranian Quarterly Journal of Political Sociology, 4 (2), pp. 369-352, 2021. (In Persian)
https://doi.org/10.30510/psi.2021.286790.1733
[10]. Alavi, Somayeh and Shokrani, Maryam, Supply Chain Risk Assessment with a Resilience and Sustainability Approach, 9th International Conference on Management and Accounting Sciences, Tehran, 2013. (In Persian)
https://civilica.com/doc/1671471
[11] R.B. Handfield and E.L. Nicholas, “Introduction to Supply Chain Management”, Prentice Hall,New Jersey, 2000.
[12]. L. Kraidi, R. Shah, W. Matipa and F. Borthwick, “Using stakeholders’ judgement and fuzzy logic theory to analyze the risk influencing factors in oil and gas pipeline projects: Case study in Iraq”, Stage II. International Journal of Critical Infrastructure Protection, 28, pp. 100337-100354, 2020.
https://doi.org/10.1016/j.ijcip.2020.100337
[14]. S.H. Mirghafouri, A. Marvati Sharifabadi and F. Asadian Ardakani, “Designing a model for risk assessment in the supply chain using an artificial neural network approach (case study: Iran-Yazd Alloy Steel Company)”, Industrial Management Studies, 11 (30), pp. 21-1, 2013. (In Persian)
https://dor.isc.ac/dor/20.1001.1.22518029.1393.11.30.1.4
[15] A. Mohammadi, A.N., Mosleh Shirazi, M.B. Ahmadi and P. Shojaei, “Designing a hierarchical model to reduce project supply chain risks based on meta-synthesis (case study: Fars Province Gas Company)”, Industrial Management, 6 (3), pp. 591-614, 2014. (In Persian)
https://doi.org/10.22059/imj.2014.50690
[16] H. Mehramanesh and S.R. Safavi Mirmohalleh, “A model for risk management in the Iranian gas industry supply chain”, Iranian Journal of Management Sciences, 15 (57), pp. 61-96, 2020. (In Persian)
https://journal.iams.ir/article_326.html
[17] F. Firuzi Jahantigh, G. Esmailian and M.A. Hazavei, “Fuzzy TOPSIS model for assessing economic risks for oil and gas EPC projects”, Quarterly Journal of Industrial Management, Faculty of Humanities, Islamic Azad University, 10 (32), pp. 55-66, 2015. (In Persian)
https://sanad.iau.ir/en/Article/923351?FullText=FullText
[18] M.M. Askari, “Identifying and prioritizing upstream oil and gas risks in Iran using the Risk Breakdown Structure (RBS) format and the TOPSIS technique”, Quarterly Journal of Economic Research and Policies, 24 (78), pp. 57-96, 2016. (In Persian)
https://sid.ir/paper/89466/fa
[19] A. Mohammadi and P. Shojaei, (2016). “Presenting a comprehensive model of supply chain risk management components: a meta-synthesis approach”. Journal of Scientific-Research Executive Management, 8 (15), pp. 112-93, 2016. (In Persian)
https://sid.ir/paper/150884/fa
[20] H. Zandhosami and A. Savji, “Risk Management in Supply Chain Management”, Journal of Development and Transformation Management, 4 (9), pp. 37-44, 2012. (In Persian)
https://sid.ir/paper/205914/fa
[21] S. Bagheri and M.R. Lotfi, “A model for implementing the risk management process in oil projects using the PMBOK standard”, Scientific-Promotional Quarterly of Standard and Quality Management, 6 (1), pp. 41-52, 2016. (In Persian)
[22] A.R. Hosseinzadeh, M.E. Mohammad Pourzarandi and M.A. Afsharkazemi, “Prioritizing Strategies Based on the Identification and Ranking of Supply Chain Risks (Case Study: Oil and Gas Operating Company)”, Supply Chain Management, 25(79), pp. 1-15, 2023. (In Persian)
[24]. P.K. Tarei, J. Thakkar and B. Nag, “A hybrid approach for quantifying supply chain risk and prioritizing the risk drivers: a case of Indian petroleum supply chain”. Journal of Manufacturing Technology Management, 29(3), pp. 533-569, 2018.
https://doi.org/10.1108/JMTM-10-2017-0218
[27]. N. Dalkey and O. Helmer, “An experimental application of the Delphi method to the use of experts” Management Science, 9(3), pp. 458–467, 1963.
https://doi.org/10.1287/mnsc.9.3.458
[28] A. tizro and M.A. Alipoor, “Identifying and Prioritizing Drivers of Agile Supply Chain in the Tourism Industry”. Supply Chain Management, 26(83), pp. 35-47, 2024. (In Persian)
[31]. S. Rhee, I. Kosuke, “Using cost based FMEA to enhance reliability and serviceability”, Advanced Engineering Informatics Journal, Vol.17, pp. 179 – 188 , 2003.
https://doi.org/10.1016/j.aei.2004.07.002
[32]. M. Asareh, “Industrial Risk Management Using FMEA Method. International Conference on Oil”, Gas, Petrochemical and Power Plants, 2012. (In Persian) SID.
https://sid.ir/paper/814979/fa
[33]. M.R. Fathi, M.H. Maleki, and Z Tahmasebi, “Risk assessment in product design with fuzzy FMEA approach”, Environmental Science and Technology, 22(10 (101)), 105-118, 2019, (In Persian), SID.
https://sid.ir/paper/397399/fa
[34]. P. Ghaderi, A. Moradi and S.B. Mokhtarpouriani, “Using the FMEA method in identifying hazards in a dam construction industry”, First National Conference on Health, Safety and Environment (HSE), Mahshahr, 2011,
https://civilica.com/doc/130676 (In Persian)
[35]. M.S. Shahbaz, R.Z.R. Rasi, and M.F.B. Ahmad, “A novel classification of supply chain risks: Scale development and validation”, Journal of Industrial Engineering and Management (JIEM), 12(1), pp. 201-218., 2019.
https://doi.org/10.3926/jiem.2792
[36]. J.V. Blackhurst, K.P. Scheibe and D.J. Johnson, “Supplier risk assessment and monitoring for the automotive industry”, International Journal of Physical Distribution & Logistics Management, 38, (2), pp. 143 – 165, 2008.
https://doi.org/10.1108/09600030810861215
[37]. R. Tummala & T. Schoenherr, “Assessing and managing risks using the Supply Chain Risk Management Process (SCRMP)”, Supply Chain Management: An International Journal, 16(6), pp. 474 – 483, 2011.
https://doi.org/10.1108/13598541111171165
[38]. G.J.L. Micheli, E. Cagno and M. Zorzini, “Supply risk management vs supplier selection to manage the supply risk in the EPC supply chain”, Management Research News. 31(11), pp. 846 – 866, 2008.
https://doi.org/10.1108/01409170810913042
[39]. O. Tang and S.N. Musa, “Identifying risk issues and research advancements in supply chain risk management”. International Journal of Production Economics, 133, pp. 25–34, 2011.
https://doi.org/10.1016/j.ijpe.2010.06.013
[41]. I. Dikmen, M.T. Birgonul, C. Anac, J.H.M. Tah and G. Aouad, “ Learning from risks: A tool for post-project risk assessment”, Automation in Construction. 18, pp. 42–50, 2008.
https://doi.org/10.1016/j.autcon.2008.04.008
[42]. M.F. Blos, M. Quaddus, H.M. Wee and K. Watanabe, “Supply chain risk management (SCRM): a case study on the automotive and electronic industries in Brazil”. Supply Chain Management: An International Journal, 14 (4), pp. 247 – 252, 2009.
https://doi.org/10.1108/13598540910970072
[43]. I.K.W. Lai and H.C.W. Lau, “A hybrid risk management model: a case study of the textile industry”, Journal of Manufacturing Technology Management, 23(5), pp. 665 – 680, 2012.
https://doi.org/10.1108/17410381211234453
[44]. S. Matook, R. Lasch and R. Tamaschke, “Supplier development with benchmarking as part of a comprehensive supplier risk management framework”, International Journal of Operations & Production Management, 29(3), pp. 241 – 267, 2009.
https://doi.org/10.1108/01443570910938989
[46]. A. Islam and D. Tedford, “Risk determinants of small and medium-sized manufacturing enterprises (SMEs)-an exploratory study in New Zealand”. Journal of Industrial Engineering International, 8, pp. 1-13., 2012.
http://www.jiei-tsb.com/content/8/1/12
[47]. Y. Lin and L. Zhou, “The impacts of product design changes on supply chain risk: a case study”, International Journal of Physical Distribution & Logistics Management, 41(2), pp. 162 – 186, 2011.
https://doi.org/10.1108/09600031111118549
[48]. T. Schoenherr, R. Tummala and T.P. Harrison, “Assessing supply chain risks with the analytic hierarchy process: Providing decision support for the offshoring decision by a US manufacturing company”, Journal of Purchasing & Supply Management, 14, pp. 100–111, 2008.
https://doi.org/10.1016/j.pursup.2008.01.008
[53]. X. Miao , X. Bao and B. Yu, “Triplex-network design for research of supply chain Reliability”, African Journal of Business Management, 4(1), pp. 31-38, 2010.
http://www.academicjournals.org/AJBM